Home / Blog / Importing Catering Equipment: 7 Hidden Costs Revealed

Importing Catering Equipment: 7 Hidden Costs Revealed

2026-08-11 BAVA Team Blog

Short answer: The product price is normally 55–70% of landed cost, and the six lines that make up the remainder are ocean freight, customs duty, import VAT or GST, pre-shipment inspection, inland delivery and port handling, plus the working capital tied up in transit. On a $50 chafing dish the realistic landed figure is $78–$95, not $60. See chafing dish sourcing considerations.

Importing buffet equipment from China? The product price is only 60% of the total cost. Shipping, customs, VAT, inspection, local delivery — these hidden costs add 40% on top.

Many new importers get shocked at the final bill. "The chafing dish was $50, why am I paying $80?"

Here are the 5 hidden costs nobody tells you about.

Hidden Costs of Importing from China

PRO TIP: Always ask for CIF price, not FOB.

FOB = you handle shipping. CIF = seller handles shipping and insurance. CIF is more expensive upfront but predictable. For new importers, CIF is safer.

KEY TAKEAWAY: Product price is only 60% of landed cost.

Product price 60%, shipping 15%, customs 10%, VAT 10%, other 5%. Budget 40% on top of product price for landed cost. If a chafing dish is $50, expect to pay $70-80 total.

Three Incoterms showing where the seller's obligation ends when importing catering equipment: FOB where the seller's responsibility ends at the origin port as the baseline, CIF which adds 2 to 4 percent and insures the goods to the destination port, and DDP which adds 5 to 9 percent and delivers to your warehouse door

The 5 Hidden Costs

Cost Typical Amount Who Pays
1. Shipping (ocean freight) 10-20% of product price You (FOB) or seller (CIF)
2. Customs duty 0-10% (varies by country) You
3. VAT / GST 5-20% (varies by country) You
4. Pre-shipment inspection $200-400 per order You
5. Local delivery $100-300 per shipment You

Hidden import costs and landed cost breakdown for catering equipment

1. Shipping (FOB vs CIF)

The biggest hidden cost. Ocean freight from China to US/EU is 10-20% of product price.

FOB (Free On Board): Seller delivers to port in China. You handle international shipping. Cheaper but more work.

CIF (Cost, Insurance, Freight): Seller handles shipping to your destination port. More expensive but easier.

Pro tip: For first-time importers, go CIF. You'll avoid surprises.

2. Customs Duty

Your country charges duty on imported goods. Buffet equipment duty rate:

Country Duty Rate
USA 0-5% (HTS 8419)
EU 2.7%
UK 2.7%
Australia 0-5%

3. VAT / GST

Value-added tax or goods and services tax. Charged on the total landed value (product + shipping + duty).

Country VAT/GST Rate
USA No federal VAT (state sales tax varies)
EU 19-25%
UK 20%
Australia 10% (GST)

See our export plug and voltage guide for more export info.

4. Pre-Shipment Inspection

Before the goods ship, hire a third-party inspector to check quality. $200-400 per order. Worth it — catches defects before they leave China.

See our chafing dish sourcing guide for quality control tips.

5. Local Delivery

From the port to your warehouse. $100-300. Usually handled by a freight forwarder.

How to Calculate Landed Cost

Formula:

Landed Cost = Product Price + Shipping + Customs Duty + VAT/GST + Inspection + Local Delivery

Example: $50 chafing dish × 100 units = $5,000 product price.
+ Shipping $750 (15%)
+ Duty $250 (5%)
+ VAT $1,200 (20% of total)
+ Inspection $300
+ Local delivery $200
= $7,700 total landed cost

That's 54% on top of product price. Budget accordingly.

Import Equipment Terms to Know

The Bottom Line

The product price is only 60% of what you'll actually pay. Shipping, customs, VAT, inspection, and local delivery add 40-50% on top. Always calculate landed cost before ordering. Ask for CIF price. Budget 40% on top of product price. Don't get shocked by the final bill.

Looking for Buffet Equipment?

BAVA manufactures commercial buffet equipment directly from our factory in China. We can quote FOB or CIF. All products CE/FDA certified, OEM/ODM available.

Landed Cost Breakdown, on a $50 Chafing Dish

Cost lineTypical amountPercentage of product priceWho paysVariable you control
Product price, FOB$50.00100%YouVolume, specification
Ocean freight, 40HQ$0.53–$0.73 per unit1–1.5%You at FOBCarton design, unit count
Marine insurance0.3–0.5% of CIF0.2%Seller at CIFIncoterm
Customs duty0–10%, 2.7% EU, 0–5% US0–10%YouHS code, origin
Import VAT or GST5–20% on duty-paid value5–20%You, recoverable if registeredRegistration
Pre-shipment inspection$200–$400 per order0.5–2% on a small orderYouOrder size
Port handling and documentation$180–$350 per shipment0.5–2%YouNothing
Inland delivery to your warehouse$100–$300 per shipment0.5–1.5%YouLocation, consolidation
Bank and document fees0.5–1.5% of payment value0.5–1.5%YouPayment method
Landed cost$78–$95156–190%——

What Actually Changes the Landed Cost

LeverSmall order, 500 unitsMedium, 3,000 unitsLarge, 8,000 unitsEffect of pulling it
Units per carton244, nestedPlus 20–35% container capacity
Container count1 × 20GP1 × 40HQ1 × 40HQ plus 1 × 20GPFixes and handling per shipment
Inspection cost per unit$0.60–$0.80$0.10–$0.15$0.04–$0.06Fixed cost spread thinner
Freight per unit$0.90–$1.30$0.53–$0.73$0.45–$0.65Volume pricing
Bank fees, as a share1.2–1.5%0.6–0.8%0.5–0.7%Smaller relative cost
Total landed, per $50 unit$86–$99$79–$88$76–$84$10–$15 per unit

The pattern is worth stating plainly: the fixed costs, inspection, port handling, documentation and bank fees, are the same on a 500-unit order as on an 8,000-unit order, and they are 3 to 5 percentage points of landed cost. That is why the first order of a new supplier is always the most expensive per unit, and why the sensible pattern is to test a mixed container of several models rather than a large container of one. A first order of 500 units of a single model is paying eight fixed fees to test one thing.

FOB, CIF and DDP Compared

IncotermSeller's obligation ends atYou arrangeTypical price differenceRisk sits with you fromBest for
EXWThe factory gateEverything, including export clearanceLowest price, 3–6% below FOBBefore the unit is even packedExperienced importers with a broker
FOBThe origin port, loadedSea freight, insurance, duty, deliveryBaselineOnce on boardBuyers with volume and a forwarder
CIFThe destination port, unloadedDuty, delivery, insurance claim handlingPlus 2–4%Still on board, but insuredFirst-time importers
DDPYour warehouse doorNothingPlus 5–9%Almost nowhereSmall orders, urgent, no broker
DAPNamed place, unloadedDuty, import clearancePlus 4–7%At the named placeOrders where you want to control duty

The honest version of the standard advice is that CIF is safer for a first order and cheaper for a large one, and the reason is insurance rather than shipping. Under FOB you have to buy marine insurance yourself and, more importantly, you have to know what to do when something is damaged in transit. Under DDP the price difference of 5 to 9% is small against the cost of a customs problem you cannot see, and for a first order of one or two models it is usually worth paying. Once you are moving 8,000 units a year, the 5 to 9% is a real number and the broker is worth setting up.

Frequently Asked Questions

What percentage of landed cost is the product price?

Normally 55 to 70%. On a $50 chafing dish the realistic landed figure is $78 to $95, which means the product price is 53 to 64% of the total. The gap is freight, duty, import VAT, inspection, port handling, inland delivery and bank fees, and on small orders the fixed components of that gap are the largest part of it.

Should a first-time importer use FOB or CIF?

CIF, because the difference is 2 to 4% and it puts the marine insurance and the shipping responsibility with the seller. On a first order of 500 units that is a few dollars per unit in exchange for not having to know what to do when a container arrives damaged. Once you are moving 8,000 units a year, the 5 to 9% premium on a DDP quote is worth reclaiming, and you should set up a broker and move to FOB.

How much does pre-shipment inspection add per unit?

$0.60 to $0.80 on a 500-unit order, $0.10 to $0.15 on 3,000 units, and $0.04 to $0.06 on 8,000 units, because the $200 to $400 fee is fixed and spreads across the order. This is the clearest argument for a larger first order, or for a mixed first order that tests several models at the same fixed cost.

Is import VAT recoverable?

Usually, if you are registered for VAT or GST and the goods are for resale. It is collected at import and reclaimed on your next return, which means it is a cash flow cost rather than a cost. For a business that is not registered, and for a buyer importing for its own use, it is a real cost and it is the single largest line on the breakdown.

What is the minimum sensible import order?

One to two cubic metres, which is 200 to 400 chafing dishes, and at that size the fixed fees are still 3 to 5 percentage points of landed cost. Below about 200 units, buying from a local stockist is usually cheaper than importing once freight, duty, inspection and the bank fees are counted, and it is a reasonable answer for a first trial of a single model.

Related reading